Museum Home
Skip to main content
Removal Existing CSA to Allow Pile Construction
Removal Existing CSA to Allow Pile Construction
Removal Existing CSA to Allow Pile Construction

Removal Existing CSA to Allow Pile Construction

Date5/6/1993
MediumColor Photo - Emulsion on Paper
DimensionsOverall: 3 1/2 x 5 in. (8.9 x 12.7 cm); Small
ClassificationsDocumentary Artifact
Catalog number1996.19.453
DescriptionPhoto of bridge column.
Status
Not on view
Removal Existing CSA to Allow Pile Construction
City of Tempe Public Works Department
5/6/1993
Pier 8 Existing C.S.A. Removal
City of Tempe Public Works Department
12/23/1992
Pier 1 (W) Column After Form Removal
City of Tempe Public Works Department
4/17/1992
Retaining Wall Northwest-1 and Access Road Bridge Pile Cap
City of Tempe Public Works Department
10/30/1992
Abut #1 Str. Exc. (Existing APS Cassion)
City of Tempe Public Works Department
3/31/1992
Abut #1 Str. Exc. (Existing APS Cassion)
City of Tempe Public Works Department
3/30/1992
Existing Tower Foundation and Stake Out
City of Tempe Public Works Department
1/22/1992
Existing Tower Foundation and Stake Out
City of Tempe Public Works Department
1/22/1992
H-Piles in Southeast Wall Footing Area
City of Tempe Public Works Department
5/29/1992
Falsework Span 8 Piles Removed Below Riverbed
City of Tempe Public Works Department
8/1/1993
Driving Piles for Span 8 Falsework
City of Tempe Public Works Department
3/30/1993
Driving Piles for Span 8 Falsework
City of Tempe Public Works Department
3/30/1993