Ash Avenue Bridge Evaluation Study - Salt River Crossing
Date5/4/1990
MediumInk on paper
DimensionsOverall: 11" x 8-1/2" x 1/2"; Small - Legal folders; Vertical format
ClassificationsDocumentary Artifact
Credit LineTransfer from Development Services Department, 1-1-2006
Catalog number2006.9.148
DescriptionBound spiral study commissioned by the City of Tempe by Donohue Engineers on the Ash Avenue Bridge - Salt River Crossing. The objective of the study is to determine the adequacy of the Ash Avenue Bridge survival of a flood.Status
Not on viewOctober 1984
